Reliance protran manual
The power inlet box is what you will plug the power cord from your generator into. The best place to mount the power inlet box is outside near where you plan to use your generator. Alternatively you can mount the power inlet box in the Protran Transfer Switch unit itself.
This has some disadvantages though. Power Inlet Filler Plate This can replace with a power inlet. Wiring Compartment Cover It used to hardwire the unit to a remote power inlet box. Watt Meters Watt meters indicate the total load. Required Tools for Installation Screwdriver Electric drill Wirecutter or stripper Four anchors and screws Hammer 4 red wire connectors for the 20A and 30A hard-wire models 4, 6, 8, or 10 yellow wire connectors depending on the model Four blue wire connectors for the 50A hard-wire models Get the best of Reliance Controls Parts Here.
Before starting the process, you should turn off the main circuit breaker in the load center to ensure safety. Next, remove the load center cover. Locate and remove a knockout in the bottom of the load center. Now, you have to insert the wires from the flexible conduit end through the knockout.
After that, attach the conduit connector securely with the provided locknut. Attach the transfer switch to the wall by using external feet. Beyond its structural capacities, do not try to bend the flexible conduit. Wiring Transfer Switch to the Load Center Initially, analyze which circuits will use during emergencies. Installing Transfer Switch on volt Circuits Now, we take the example on a 6-circuit transfer switch and wiring the refrigerator to switch A and furnace to switch D.
Shut off the power of the refrigerator circuit breaker. Loosen the screw that secures the wire to the breaker. You have to disconnect the wire from the circuit breaker. Now, find the black and red wires marked with A on the transfer switch. Connect the red wire to the refrigerator selected breaker. Check out the convenient length and cut red wire A approximately. After connecting the wire to the circuit breaker, you have to retighten the screw. Next, cut the black wire A in convenient length and align in the removed wire place which you removed initially from the fridge circuit breaker.
Insert both wires, the removed wire from the circuit breaker in step 1, and the black wire into a yellow wire connector. Twist the connector tightly and connect the wires back into the wiring compartment of the load center. Find out red and black wires for the circuits with the handle tie. Turn off the double-pole breaker in the load center. Next, disconnect the wires from the circuit breakers by loosening the screws. Find the Reliance Controls Corporation generator transfer switch that best fits your needs.
Find A Dealer. Home Welcome! These indoor surface mount transfer switches are designed for fast installation in residential and commercial applications. The inch flexible conduit whip attaches easily to the load center and all wires are clearly marked. A wattmeter panel WP is available for all models without meters except models A and A.
The wattmeter panel includes an opening, with cover, for an optional power inlet. Many symbols made use of on a wiring diagram look like abstract variations of the genuine things they represent. A button will certainly be a break in the line with a line at an angle to the cable, much like a light button you can turn on and off.
A resistor will certainly be represented with a series of squiggles symbolizing the limitation of present circulation. An antenna is a straight line with 3 tiny lines branching off at its end, much like a real antenna. Facebook Tweet Pin.
0コメント